LV CT metering advice form

For use by contractors and switchboard manufacturers to advise of LV CT revenue metering installations.

*** It is strongly recommended that the LV CT application is lodged as early as possible, to allow any required MSB alteration or non-standard items to be resolved before the construction and installation of the design. ***

Important information:

  • Orthographic Drawings of the switchboard with multiview projections to present comprehensive front, top, rear and side views must be supplied
  • Comprehensive Single Line Diagrams including existing site infrastructure where performing an alteration to an existing site must be supplied
  • For switchboards containing multiple CT meters, it is essential to provide the details (CX or EWR, NMI and Max Load) for each of the connections that require assessment via this webform
  • Please identify the NMI that will be associated with each CT chamber
  • An accepted offer must be in place for all connections that require assessment in this submission
  • Where you have extenuating circumstances regarding an application, site or timeline, please complete a QECM query call back request form for advice.

Please view our privacy statement regarding the collection of data.

Required fields are marked with an asterisk (*).

Contractor Contact Details
Please enter the ABN as 11 digits with no spaces
Please enter your best business hours contact number as 10 digits with no spaces
Connection Details
Which Queensland Electricity Connection Manual (QECM) are you applying under?
Please enter first name and last name
Street address of the connection
CTs are required for
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Is there a combination of CT and whole current metering in this switchboard?
Confirmation & Attachments
Meter panel location
Maximum file size 5MB
Maximum file size 5MB
Maximum file size 5MB
Maximum file size 5MB
Important note for attachments
Acknowledgements