Design & construction contractors

We regularly engage contractors to work on our distribution and subtransmission networks.  This information is to help contractors, service providers and others to prepare tenders and meet our work requirements.

You can search our entire design and construction document library on this page via the keyword search and filtering options below.  There is also a search function on each individual webpage in this section.

Alert service

If there are particular documents you're interested in you can subscribe to our Alert Service and we'll email you when the documents you select are updated.311536


Showing 1 - 20 of 270

SP0405C03 LV Cable Inspection and Test Plan

Updated: 25 Mar 2013 4:52pm

Inspection and test plan for LV cable.

SP0504C01 Power Transformer Dielectric and Insulation Test Report

Updated: 25 Mar 2013 4:53pm

Test report for power transformer dielectric and insulation.

SP0504C01R01 Power Transformer IR and DDF Temperature Correction Test Report

Updated: 25 Mar 2013 4:52pm

Test report for power transformer IR and DDF temperature correction.

SP0504C04 Power Transformer No Load Loss Test Report

Updated: 25 Mar 2013 4:53pm

Test report for power transformer no load loss.

SP0504C05 Power Transformer Load Loss Test Report

Updated: 25 Mar 2013 4:52pm

Test report for power transformer load loss.

SP0504C06 Power Transformer Load Loss and Impedance Test Report

Updated: 25 Mar 2013 4:53pm

Test report for power transformer load loss and impedance.

SP0233C08 Schneider Automatic Circuit Recloser Inspection and Test Plan

Updated: 25 Mar 2013 4:53pm

Inspection and test plan for Schneider automatic circuit recloser.

MN000301F125 On Load Measurement (General) Test Report

Updated: 25 Mar 2013 4:53pm

Test report for on load measurement (general).

MN000301F126 Bus Zone On Load Measurement Test Report

Updated: 25 Mar 2013 4:52pm

Test report for bus zone on load measurement.

MN000301F127 Transformer On Load Measurement Test Report

Updated: 25 Mar 2013 4:52pm

Test report for transformer on load measurement.

SP0511C01 Transformer Primary Injection Test Report

Updated: 25 Mar 2013 4:52pm

Test report for transformer primary injection.

SP0511C01R01 Transformer Primary Injection Calculation Spreadsheet (Dyn)

Updated: 25 Mar 2013 4:53pm

Calculation spreadsheet for transformer primary injection - Dyn transformer.

SP0511C01R02 Transformer Primary Injection Calculation Spreadsheet (YNd)

Updated: 25 Mar 2013 4:53pm

Calculation spreadsheet for transformer primary injection - YNd transformer.

SP0511C01R03 Transformer Primary Injection Calculation Spreadsheet (Ynynd or Ya0d)

Updated: 25 Mar 2013 4:53pm

Calculation spreadsheet for transformer primary injection - Ynynd or Ya0d transformer.

SP0511C01R04 Transformer Primary Injection Connection Schedule

Updated: 25 Mar 2013 4:52pm

Connection schedule for transformer primary injection.

MN000301F171 Defect Reporting and Recording Tool Ver 1

Updated: 16 Dec 2014 12:29pm

Provides a standardised Defect Report for recording defects, requests for information and issues arising from project activities on Bulk Supply and Zone Substations

SP0406C01 Commissioning Ground Mounted Distribution Substation and Switchgear Test Report, Inspection and Test Plan

Updated: 25 Mar 2013 4:52pm

Test report, inspection and test plan for commissioning ground mounted distribution substation and switchgear (included in test report).

SP0510C06 Earth System Inspection and Test Plan

Updated: 25 Mar 2013 4:53pm

Inspection and test plan for earth system.

SP0510R03 Substation Earth System Injection Analysis Tool User Guide

Updated: 11 Mar 2015 2:22pm

Provides a guide to using SP0510C07 Substation Earth System Injection Analysis Tool.

SP0522 Earth Resistivity Testing SWP

Updated: 11 Mar 2015 2:39pm

Standard Work Practice (SWP). Describes the test method for obtaining earth resistivity data.

Showing 1 - 20 of 270